Skip Links

Home > Timeline

TIMELINE

1993

Coal Clough Windfarm

Renewable Energy Systems, a Sir Robert McAlpine Group company, has been engaged in the design and development of windfarms since 1989.

Sir Robert McAlpine undertook the turnkey contract to provide this 9.6MW installed capacity windfarm. At the time of construction it was the largest windfarm in England.

Back to listings