ROYAL ALBERT HALL

ROYAL ALBERT HALL

We are ensuring it is 'business as usual' at the Royal Albert Hall operations during work to upgrade its heating system.

 
  • Thumbnail of Royal Albert Hall
  • Thumbnail of Royal Albert Hall
  • Thumbnail of Royal Albert Hall
Image of Royal Albert Hall

General Information

We are upgrading the heating and cooling systems at the Grade 1 Listed Royal Albert Hall in South Kensington.

This includes replacing the existing steam heating system with a new Low Temperature Hot Water system.

The phased works are carried out at night to minimise impact on the venue’s operation.

Fast facts

Client
Royal Albert Hall
Duration
2014 - Present
Location
London
Region
London & South East
Sector
Sport & Leisure

Our project team devised a workable solution which allows the hall to remain fully operational and maintains provision of heating to 80% of the venue at all times.

The methodology we developed enabled the work to be completed in just 18 months. This avoided the Hall having to either shut for a period or complete the work six months at a time over six years.

We developed a working methodology using welded stainless steel pipework and orbital welding which eliminates the need for hot works in key high risk areas.